컨텐츠 내용
- 수강신청
- 과정정보
SAP S/4HANA PP 마스터 패키지
								
							| 차시 | 강의명 | 
|---|---|
| 1차시 | 강사 인트로 | 
| 2차시 | Accessing and Creating Types of Data | 
| 3차시 | Using Organizational Elements and Master Data in Production | 
| 4차시 | Introducing Material | 
| 5차시 | Creating a Material | 
| 6차시 | Assign Documents | 
| 7차시 | Classifying Material | 
| 8차시 | Managing the Material | 
| 9차시 | Working with the Product Master | 
| 10차시 | Introducing Bills of Material (BOMs) | 
| 11차시 | Managing BOMs | 
| 12차시 | Changing BOMs with Engineering Change Management | 
| 13차시 | Performing mass changes and working with browsers | 
| 14차시 | Analyzing BOMs | 
| 15차시 | Creating Work Centers | 
| 16차시 | Creating Capacities in a Work Center | 
| 17차시 | Explaining Task Lists | 
| 18차시 | Creating Material Assignments and Component Allocations | 
| 19차시 | Creating Suboperations and User-Defined Fields | 
| 20차시 | Creating Product Versions | 
| 21차시 | Creating Production Resources and Tools (PRTs) | 
| 22차시 | Analyzing and Changing Task Lists | 
| 23차시 | Describing Phantom Assemblies | 
| 24차시 | Creating Co-Products and By-Products | 
| 25차시 | Creating Alternative Components | 
| 26차시 | Creating Multiple BOMs | 
| 27차시 | Creating Variant BOMs | 
| 28차시 | Modeling Sequences | 
| 29차시 | Modeling Alternative Manufacturing Processes | 
| 30차시 | Creating Reference Operation Sets | 
| 31차시 | Applying Lead-Time Scheduling to Update a Material | 
| 32차시 | Scheduling Time Elements and Reduction in the Routing | 
| 33차시 | Allowing for Scrap in the Routing | 
| 34차시 | Engineering Workbench | 
| 35차시 | Product Lifecycle Management (PLM) Web User Interface | 
| 36차시 | Customizing | 
| 37차시 | Material | 
| 38차시 | Routing | 
| 39차시 | Outlining Supply Chain Planning at a Glance | 
| 40차시 | Outlining Production Planning in SAP S/4HANA | 
| 41차시 | Outlining Master Data for SAP S/4HANA Production Planning | 
| 42차시 | Outlining Demand Management in SAP S/4HANA | 
| 43차시 | Planning Make-to-Stock Production | 
| 44차시 | Planning Make-to-Order Production | 
| 45차시 | Applying Demand Management Enhancements | 
| 46차시 | Outlining Prerequisites, Setting Up, and Executing MRP | 
| 47차시 | Highlighting Technical Process Steps of MRP | 
| 48차시 | Outlining Advanced Planning: PP/DS in SAP S/4HANA | 
| 49차시 | Reviewing Master Data for Advanced Planning | 
| 50차시 | Activating Advanced Planning | 
| 51차시 | Evaluating Alerts with the Alert Monitor | 
| 52차시 | Planning Production with the Product View | 
| 53차시 | Recapitulating Planning Strategies 20 and 50 | 
| 54차시 | Recapitulating Planning Strategies 40 and 70 | 
| 55차시 | Exploring Steps in PP/DS Material Requirements Planning | 
| 56차시 | Exploring Heuristics and Functions in PP/DS | 
| 57차시 | Applying the PP/DS Planning Run | 
| 58차시 | Exploring Concepts and Principles for Detailed Scheduling | 
| 59차시 | Applying Transactional Tools for Detailed Scheduling | 
| 60차시 | Applying Apps for Detailed Scheduling | 
| 61차시 | Using the PP/DS Optimizer | 
| 62차시 | Outlining Demand-Driven Replenishment | 
| 63차시 | Outlining SAP Fiori and the System Landscape | 
| 64차시 | Outlining Production Orders | 
| 65차시 | Processing a Production Order | 
| 66차시 | Analyzing the Order Structure | 
| 67차시 | Creating Production Orders | 
| 68차시 | Analyzing Master Data Selection | 
| 69차시 | Scheduling Production Orders | 
| 70차시 | Describing the Costing of Production Orders | 
| 71차시 | Performing Availability Checks | 
| 72차시 | Discussing Capacity Planning | 
| 73차시 | Releasing Production Orders | 
| 74차시 | Printing Shop Floor Papers | 
| 75차시 | Performing Material Staging and Goods Issue Postings | 
| 76차시 | Confirming Production Orders | 
| 77차시 | Posting Goods Receipts | 
| 78차시 | Performing Order Settlement | 
| 79차시 | Archiving and Deleting Production Orders | 
| 80차시 | Outlining Informations Systems and Reporting | 
| 81차시 | Outlining Mass Processing and Automation | 
| 82차시 | Outlining the Data Exchange with the Process Control Level | 
| 83차시 | Outlining SAP S/4HANA Manufacturing for Production Engineering and Operations | 
| 84차시 | Performing Order Splits | 
| 85차시 | Creating Shift Notes and Shift Reports | 
| 86차시 | Outlining Production Types | 
| 87차시 | Exploring Process Orders: Characteristics and Execution | 
| 88차시 | Exploring Repetitive Manufacturing: Characteristics and Execution | 
| 89차시 | Exploring Kanban: Characteristics and Execution | 
| 90차시 | Outlining SAP Fiori and the System Landscape | 
| 91차시 | Outlining S/4HANA Capacity Planning | 
| 92차시 | Evaluating with the Work Center Load Report | 
| 93차시 | Using Further Capacity Evaluation Reports | 
| 94차시 | Outlining the Manage Work Center Capacity App | 
| 95차시 | Navigating the Tabular Planning Table | 
| 96차시 | Dispatching Operations in the Tabular Planning Table | 
| 97차시 | Navigating the Graphical Planning Table | 
| 98차시 | Using Basic Scheduling and Dispatching Controls Settings | 
| 99차시 | Using Additional Scheduling Control Settings for Interactive Planning | 
| 100차시 | Using Floats to Limit Dispatching | 
| 101차시 | Using Period Splits in Dispatching | 
| 102차시 | Using Dispatching Sequences and Methods for Setup Time Optimization | 
| 103차시 | Dispatching and Rescheduling with Production Versions | 
| 104차시 | Dispatching and Deallocating Operations Using Background Processing | 
| 105차시 | Modelling Down times in Capacity Planning | 
 
 
						 
							
